Post no.



36 months

Work package

WP3, D3.2: Molecular break-up by laser in RFQ cooler

Recruiting partner

CERN, Switzerland


Construction and commissioning of a mass separator and RFQ-Cooler for molecular isotope beams break-up.

Expected results

  1. Participate in the construction of an isotope separator
  2. Commission an isotope separator with beam
  3. Proceed with the assembly of a RFQ cooler
  4. Commission a RFQ cooler with beam
  5. Participate in molecular break-up tests

Enrolment for PhD at

University of Manchester, United Kingdom

Planned secondment(s)

Lemer Pax, France – 5 months –Engineering design for a maintenance-free RFQ cooler/purification device